125kW/261kWh C&I BESS project at Gia Lam factory

An industrial 125kW/261kWh liquid-cooled BESS installation at an automated manufacturing facility in Gia Lam, Hanoi, delivering peak shaving and sub-10ms UPS protection.

Capacity 125 kW / 261 kWh
Location Gia Lam, Hanoi, Vietnam
125kW/261kWh C&I BESS project at Gia Lam factory

Commercial & industrial BESS installation

A 125kW / 261kWh industrial lithium battery energy storage system integrated at an automated precision factory in Gia Lam, Hanoi. Serves two mission-critical roles: Peak shaving electricity costs and 24/7 UPS backup for automated robotic production lines.

Premium cabinet engineering

Equipped with high-density 314Ah LFP cells, a 3.2kW closed-loop liquid-cooling unit maintaining cell temp deltas ≤ 2°C, bidirectional PCS converter, 3-tier BMS protection, and integrated automated Novec 1230 clean agent fire suppression.

Financial return & operational resilience

Charges automatically during overnight valley hours (~1,100 VND/kWh) and discharges during mandatory daytime peak production hours (~3,200 VND/kWh), cutting monthly power bills by over 45 million VND. Instantaneous < 10ms UPS transfer protected the plant against 100% of grid sag events without single scrap waste.